Monday, June 12, 2017

Actualization

As with many projects, the design and planning stages take longer than the actual execution.  Making a new sail cover for Eolian's mizzen was one of those projects.  I started thinking about this last summer, while hanging on the mizzen boom by one arm, way out past the stern rail, making up the fasteners on the far end of the sail cover.  I have been doing this acrobatic act for 20 years, but lately my shoulders have started to bother me, telling me that this process was going to have to change.  

Well finally last week everything came together and I was able to spend the time to put the plans and design to the test: actual sewing.

You really want to use a hot knife for this...

I unrolled the Sunbrella on the dock, laid out the pieces using a chalk line, and cut them out using my brand new, handy-dandy hot knife (you really want to use a hot knife for this work because it seals the edges of the cut, preventing unraveling).  The only tricky part of the layout was the placement of the cut outs on the side pieces for the lazy jacks.  To get these right, I tied the lazy jack lines to the boom at their design locations, and then stretched a tape measure along the diagonal that the top of the sail cover will make, taking the measurements where the diagonal intersected the jack lines.

Then the depth of the cut outs needed to be established.  I wanted them to be just deep enough so that the top of the cut out, which will be the bottom once the stitching to make the batten pocket is completed, would be just above that seam in the finished product.  Here's the detail on that:  I had determined that a 4.5" circumference would make a batten pocket large enough to accommodate the 3/4" schedule 40 PVC pipe that I was going to use as battens.  Adding a 1/2" seam allowance, I struck a "fold-to" line 5" away from the top edge of the side piece.  Then I laid out the cut outs so that their ends were 1/2" (seam allowance) + 3/8" (allowing for the edging to be applied to the cut outs) = 7/8" from the fold-to line.

The rest was just sewing.  The cover is just shy of 12 feet long, and there is no place inside Eolian to stretch it all the way out.  But sewing it over the saloon table worked out OK.



I mentioned that I used 3/4" sched 40 PVC pipe for the battens (the gray kind, rated for outdoor use).  PVC pipe comes in 10 foot lengths; the sail cover is just shy of 12 feet long...  a splice was necessary.  I didn't want to use a coupling, since that would make a lump that would make feeding the battens into the pockets difficult.  It turns out that 1/2" sched 40 pipe has an OD just slightly larger than the ID of 3/4" pipe.  So I bought a short length of 1/2" pipe, cut two 12" lengths, a slit one side of each piece lengthwise on my little table saw.  That 1/8" kerf provided just the right amount of clearance to allow the 1/2" pipe to telescope into the 3/4".  Assembling with pipe dope gave me a smooth splice.

Almost done...
I added ties that go under the sail using black Sunbrella webbing and Common Sense fasteners (not visible in this picture - they're on the other side). 

The top zipper would be impossible to operate if its aft end were not stabilized - a short strap there is seized to the topping lift line.  The finishing touch is a tiny block seized to the topping lift line just above the zipper seizing - and a 1/8" line loop routed thru the block and tied to the zipper pull allows the zipper to be operated while standing on the deck, not hanging over the rail.  Doing this work was interesting...  I had to swing the boom out over the dock and stand on top of a ladder to reach the aft end of the boom.

I wasn't sure what I was going to do with closing off the aft end - I think I'll do nothing - the opening is not large enough to bother with. 

I still need to make a front panel that wraps around the mast - the zippers that will attach it to the sail cover are already installed on the sail cover.

And I haven't yet cut the lazy jack lines to length - I think I am going to fiddle with them a little more - I want to see how things settle in with some use.

Previous post in this series

Share/Bookmark

Tuesday, May 30, 2017

For The Birds


How about this visitor that showed up on our masthead recently?

Actually, birds sitting up there are not my favorite thing - not even our National Bird...  perhaps especially not our National Bird.  See, that guy weighs 10-15 lb.  And that thing he has his left foot on was not made to carry his weight, or even half of it.   Thankfully he is too big to get both feet on it.

That "thing" is the sensor for our wind instrumentation - a pretty essential thing for a wind-powered vehicle.  See the spinner (wind speed) and fin (wind direction) out on the end?  I've already had to repair the direction sensor once due to an obese bird sitting on it and breaking it.

So, despite the delite of our neighbors (m/v Konocti Bay, who captured the photo), I shooed him off by banging on the shrouds.



Share/Bookmark

Monday, May 15, 2017

Haulout 2017

We haul out Eolian every three years for a new coat of bottom paint.  Our last was in the spring of 2014, just before we moved her to Anacortes, so she was due this spring.

For the almost 20 years we have been responsible for her maintenance, Eolian has been hauled using a Travelift - a huge contraption that lifts the boat out of the water bodily using two enormous straps:

Scary sight!

This has not been an easy task for us.  First, the Travelift at Shilshole was not large enough to haul Eolian unless we backed her into the Travelift slip.  And we had to disconnect the topping lift for the mizzen boom and drop it down.  And even then, the mizzen mast was always very uncomfortably close to the cross beam of the Travelift.  Oh, and the boat yard required that we had no roller furled sails aboard when we were blocked up (apparently one came open in a windstorm years ago and boats got knocked over like dominoes).  So we always had to remove our yankee - not a simple task because it is so large.

Ah, but not this year.  First, in Anacortes, apparently it is the SeaLift which is all the rage, not the Travelift.  The SeaLift is just an enormous, self-propelled boat trailer.  The boat rests on inflatable bunks (8-10 psi) that contact nearly the entire length of the hull - a much gentler loading than the two straps on the Travelift.  As you would expect, the operator backs the SeaLift into the water and you just drive your boat onto it, just as if it was a 16' ski boat.  Unlike a ski boat trailer tho, the SeaLift has the ability to keep your boat level as it comes out of the water, up the ramp, and onto shore.

We didn't even have to take the dinghy off!
This yard did not require removal of our headsail, and we didn't even have to take off the dinghy!

Adding to the weirdness, the actual yard is about a half a block down the street and on the other side.  So Eolian actually took a trip on land, stopping traffic and everything.

Trundlin' down the road...
Sadly however, not all was roses and wine...  Eolian has a couple of depth sounder transducers mounted on fairing blocks on her hull, and I was afraid that the weight of the boat on them could cause damage if they lined up with the inflatable trailer bunks.  This has never been a problem with a Travelift, because the contour of the hull has the straps a long ways out from them.

Uh oh...

Yup, Murphy played his part.  The bunk lined up precisely on the transducer on the port side, as you can see - the uncleaned part of the hull is uncleaned because it was against the bunk when the hull was pressure washed.

It moved.
After things were dried off, it was obvious that the fairing block had moved towards the centerline of the hull.  The missing paint revealed the disturbance.

Long deliberation on my part concluded that the risk of damaging or breaking the transducer while removing it for a rebedding far outweighed the risk of a minor leak if we simply just thoroughly caulked the seam between the fairing block and the hull, and between the fairing block and the transducer (yes, it was cocked slightly in the block).  So digging out all the loose paint and caulking with 5200 was the order of the day.

Blocked up and waiting for the paint crew
While waiting for Eolian's turn with the paint crew, I used a small portable generator, a ladder, and a buffer and buffed out the hull.  It really makes a huge difference!

Shiny!
Wow - that makes it sound like I spent the afternoon buffing.  Not so.  Buffing out Eolian is a more like buffing out your house.  It took me Tuesday thru Saturday, working 6-7 hours a day to get it done.  But she looks like a new boat afterwards!

Fresh paint always looks wonderful
And then on Monday the paint crew finished their touch-ups, and once again we were headed down the street to the launching ramp...

What's wrong with this picture?
Would I use a Sealift again?  With our underbody configuration, I think I'll avoid it.  But the transducer works fine and is not leaking... yet...




Share/Bookmark

Tuesday, May 9, 2017

Getting Rid Of The Stink At The Stern

The Admiral has put her foot down.  Henceforth, there shall be no more bad smells wafting from our stern when the head is flushed.

And so let it be done.

Commercial versions of holding tank vent filters can be had - for something like $100.  And these are throw-aways...  after a year or so, you discard them and buy another.

But these are not complex devices.  Could I make one?

Sure.  The idea came from Drew; my additions are the methods for retaining the charcoal.

Well, first the charcoal.  "Activated charcoal" is a kind of charcoal which is manufactured to have incredible surface areas - as much as 500 m2 per gram... and these surfaces are loaded with active catalytic sites.  It is the perfect thing to use to adsorb and catalytically deactivate head odors (primarily H2S).  And it is cheap and easily available.  I got this 1 lb bag of granules (don't use the powder - too hard to contain it, and too much pressure drop for gases flowing thru the bed) for just over $11, delivered to my doorstep:

1 lb. activated charcoal:  $11
Next, we need a container for the charcoal, one which can be inserted into the holding tank vent line.  I had some scrap 2" PVC pipe, so all I needed was some fittings:

Pipe fittings:  $5
... a glue-on cap (on the left), and a screw-on cap with its glue-on female half.  To provide a way to attach fittings, I drilled each cap and threaded them with a 1/2" NPT pipe tap.

12" of 2" PVC:  $0  (scrap)
So here's what the finished filter will look like.

Of course, if I just pour in the charcoal granules, they will just run out the holes in the ends.  How to retain it?


Scotchbrite pad: $0 (stolen from the galley)
I robbed a Scotchbrite pad from the galley and cut a couple of disks out of it, sized to snugly fit inside the PVC pipe.  The Scotchbrite is perfect for this because it has pores small enough to retain the charcoal, and yet it has so much open area that it provides virtually no pressure drop.

But:  if I just put these disks into the ends of the pipe, they will wedge down against the pipe fittings, making for quite small flow areas.  So I needed to support the pads with something else that would have the same extremely low pressure drop characteristics, and yet bulk up perhaps 1/2" below the pads.  VoilĂ !  Enter the shower scrunchy:

Shower scrunchy: $0.89
A small piece of this cut off from the wad is stiff enough to provide good support and yet is almost all open space...  no pressure drop at all.

Scrunchy - umm, well, scrunched

Now to assemble the pieces.  First, I glued the end cap and the threaded female fittings onto the pipe.  Next, I stuffed some of the scrunchy down the pipe.  And then put the Scotchbrite disk in... and immediately discovered a problem.  Getting the disk to remain perpendicular to the pipe was impossible once it contacted the scrunched scrunchy.

And then I hit on it:  another piece of scrap pipe, this one 1-1/2", which nicely telescoped in the 2" pipe.  Pushing the scotchbrite disk down with the pipe ensured that it remained perpendicular.

1-1/2" pipe telescoping installer
It also provided a secondary benefit.  Pushing it down and compressing the scrunchy, I was able to fill most of the charcoal....

Filling charcoal thru the telescoping pipe
...and then by jiggling the 1-1/2" pipe up and down slightly while withdrawing it, the charcoal remained in place, compressing the scrunchy by itself now.

Add the second scotchbrite disk
Then to finish, I added the second scotchbrite disk and stuffed the rest of the scrunchy into the end of the cylinder.  The last bit of the scrunchy went in thru the pipe fitting hole in the cap.

Et voilĂ !

Blowing thru the completed filter shows that there is almost no pressure drop, and yet the charcoal is held firmly in place.  Success!

Now I only need to find the time to cut the vent line and install it.








Share/Bookmark
Related Posts Plugin for WordPress, Blogger...